We are remodeling the water porch on the pond, which is in process. We busted out the bad
and loose concrete and the first pour (Piqua Concrete again) was for the retaining wall.
The second pour was for the porch piece.
For the third pour we did the walls that go beside the steps.
Check back when we pour again for the steps!